Posting this on a new thread as i didn't have any response here.... however Kudos to the person who created this http://www.symantec.com/connect/articles/how-move-sepm-one-server-another-server
Hi,
Is there a seemless way of migration keeping both the existing and new servers? and slowly making the old one redundant for decommission.
Am planning to migrate my SEPM server from Windows 2003 to 2012 R2 on a new box.
My current setup is as follows:
SEPM 12.1 RU5 server hosted on Windows 2003 SP2
Database : on a different SQL box (SQL 2012)
New Server: with Windows 2012 std R2
SEPM 12.1.6 may be.
Database: use the same existing DB on different SQL box.
is this possible without disrupting my old SEPM ?
Then slowly plan to migrate the client using SYLINK drop to change the communication settings on the clients.
are there any articles that i can refer to in doing this. please help !