I need a solution
Dear Support,
We would like to ask some questions related to SEPM upgrade with replication.
Background Information
- We have deployed two SPEM in our environment.One is in Hong Kong and other one is in Singapore. Currently we have enabled replication between two sites via WAN link.
- SPEM are installed on Windows Server 2008 R2 and running embedded database.
- Current version of SEPM is 12.1.5337.5000 (RU5) , plan to upgrade to 12.1.6 (RU6 MP6).
Question
Q1.Have any issue if we disable replication between two sites for a long time ?
Q2.How long can replication disable ? e.g. 1 week / 1 month / no limitation
Q3.What is impact if we disable replication for long time ?
Q4.Could we reenable the replication between two sites after long period of time?
Please kindly advise.
Thanks
Kidd